Lianokladi – Domokos railway section to operate very soon in central Greece

The successful completion of the required tests on Railway Bridge 26 in Ekarra, Fthiotida, were announced recently with a press release by ERGOSE, while at the same time, it was made known that next week the last under construction section of Athens-Thessaloniki corridor, Aghies-Domokos, about 21 km long, will be released to operation, ypodomes.com reports.

With the release of this last section, the modernized, double-track railway line of the country’s main corridor connecting Piraeus and Athens to Thessaloniki, with a total length of 500 km will finally operate, allowing a significant reduction of the distance between Greece’s two largest cities to about 4 hours.

According to a previous press statement by ERGOSE, diesel trains will be using the new line between Lianokladi and Domokos and shortly after (around the end of February), electric trains will also enter service.

The ceremony for the full operation of the new, upgraded line is expected to be attended by Minister of Infrastructure and Transport, Mr. Christos Spirtzis while there will be updates for the remaining works concerning signaling and ETCS systems, that will allow a further reduction of the time distance to just 3 hours and 30 minutes.

RELATED TOPICS: GreeceGreek tourism newsTourism in GreeceGreek islandsHotels in GreeceTravel to GreeceGreek destinations Greek travel marketGreek tourism statisticsGreek tourism report

Photo Source: Wikimedia Commons License: CC-BY-SA Copyright: Tobias b k?hler


+ posts

Subscribe to our Newsletter

Follow Us

NEWS FEED

Δοκιμή

Visit Vavoulas Website
Amaronda Hotel — Book Online