Power to return to all networks undamaged by Northern Attica fires

The Hellenic Electricity Distribution Network Operator (HEDNO) was ordered on Friday to restore power at the remaining networks that were not damaged by fire but had been shut down for precautionary reasons, ANA reports.

The order came from the Independent Power Transmission Operator (IPTO), which said power will be restored wherever there is no damage to the network by fire or other, local reason.

RELATED TOPICS: GreeceGreek tourism newsTourism in GreeceGreek islandsHotels in GreeceTravel to GreeceGreek destinationsGreek travel marketGreek tourism statisticsGreek tourism report

+ posts

Subscribe to our Newsletter

Follow Us

NEWS FEED

Visit Vavoulas Website
Amaronda Hotel — Book Online